TO MEET compliance requirements, an upgrade to an existing 3 level office building in Brisbane’s Stone Corner also required a disabled access lift.
The ElfoLift 2 was the perfect choice, especially as the minimal pit of only 150mm made the preparation work in the existing basement slab very easy to accommodate. The colour and finishes selection was an elegant combination of polished stainless steel and F12PPS similinox skinplate. To eliminate the need for any local finishing work, a manufactured stone floor direct from the manufacturer was also included.
The end result was a professional and classy commercial solution.